# CV Engineering > CV Engineering delivers construction engineering, project management, and construction management for steel mills and heavy industrial facilities\. Serving clients across the U\.S\. and internationally\. Generated by Yoast SEO v27.9, this is an llms.txt file, meant for consumption by LLMs. ## Pages - [Disclaimer](https://cvengineering.com/disclaimer/) - [Homepage](https://cvengineering.com/) - [Careers](https://cvengineering.com/careers/) - [Contact](https://cvengineering.com/contact/) - [About](https://cvengineering.com/about/) ## Services - [Engineering](https://cvengineering.com/services/engineering/) - [Project Management](https://cvengineering.com/services/project-management/) - [Construction Management](https://cvengineering.com/services/construction-management/) - [Steel Detailing](https://cvengineering.com/services/steel-detailing/) - [Project Development](https://cvengineering.com/services/project-development/) ## Projects - [Big River Steel NGO Project](https://cvengineering.com/portfolio/big-river-steel-ngo-project/): Big River Steel NGO Project \(Oceola, AR\) Non\-Grain Oriented processing line Facility \| Construction Engineering Services Adding new lines to the existing facilities \| 2021–2023 After successful construction installation and operation of all Phase 1 and Phase 2 equipment, Big River Steel \(BRS\) is expanding the Cold Rolling Facility by adding the Non\-Grain Oriented \(NGO\) processing lines facility\. CV Engineering provided construction engineering services for the NGO facility\. Project Highlights: Reversing Cold Mill \#1 \(RCM\) Coil Repair Line \(CRL\) Annealing and Coating Line \#1 \(ACL\) Bare coil slitting line and Packing Line Modifications to the existing Continuous Pickling Line by adding Silicon Sludge Sedimentation and Strip pre\-rinsing and pre\-heating system 20\-Coil Heating Stations at entry end of CPL Coil Transfer Cars Additional Water System for the above Air Compressor Building One \(1\) current and Three \(3\) future Hydrogen Units \(PHG\-830\) Main Substation will be expanded as required for the above equipment and considering future facilities electrical loads Our Scope: Site Development Site Utilities \& Infrastructure Building Foundation and structure Equipment Foundations Piling Structural Steel HVAC \& Plumbing Building Utilities \& Electrics Process Piping \& Electrics - [SDI Columbus – Flat Rolling Facility](https://cvengineering.com/portfolio/sdi-columbus-flat-rolling-facility/): As the prime engineering company, CV Engineering delivered the 1,400\-acre greenfield flat rolling facility for Steel Dynamics, Inc\. \(SDI\) in Columbus, Mississippi\. This remains one of the most comprehensive and complex steel mill assignments in our firm’s history\. \\ \Planning\\ The project required a fully integrated design for both Hot Mill and Cold Mill complexes\. Planning involved extensive site work, railroad track design, and the detailed engineering of a comprehensive water system to support end\-to\-end production\. \\ \Design \& Construction\\ We provided multidisciplinary engineering across the entire facility, including two electric arc furnaces, vacuum tank degassers, and thin slab casters\. The Cold Mill design featured continuous and push\-pull pickle lines, galvanizing lines, and annealing furnaces\. Our scope included everything from building structural steel to complex cooling water systems\. \\ \Results\\ The facility achieved a complete, end\-to\-end production capability, supplying finished and coated products to the construction, automotive, and appliance markets\. This project stands as a defining example of our ability to execute mega\-scale, integrated mills from concept through completion\. - [Big River Steel – Mini Mill \#2](https://cvengineering.com/portfolio/big-river-steel-mini-mill-2/): Following the success of the first mill, CV Engineering was selected as the lead engineering partner for Big River Steel’s 3\.6 million ton\-per\-year expansion with Mini Mill \#2\. This facility was constructed adjacent to the existing operation in Osceola, Arkansas\. \\ \Planning\\ Leveraging institutional knowledge from Mini Mill \#1, we planned a 1\.6\-million\-square\-foot Cold Mill Complex\. The planning focused on creating a seamless interface between the new facility and the existing mini mill infrastructure\. \\\Design / Construction\\ The engineering scope encompassed a full suite of advanced processing lines, including a pickling line, tandem cold mill, and automated coil storage\. We delivered 35kV plant power distribution, piling and foundation systems for major equipment, and all process piping and electrical systems\. \\ \Results\\ The expansion provided Big River Steel with enhanced capacity to produce flat\-rolled products for demanding automotive and construction markets\. Our involvement ensured consistent design quality and efficient coordination across the multiple mills\. - [PRO\-TEC Coating – Galvanizing Line \#3](https://cvengineering.com/portfolio/pro-tec-coating-galvanizing-line-3/): CV Engineering delivered construction engineering for a state\-of\-the\-art Generation 3 Continuous Galvanizing Line for PRO\-TEC Coating in Leipsic, Ohio\. As a joint venture between US Steel and Kobe Steel, this expansion added cutting\-edge capability for advanced, high\-formability automotive steel grades\. \\ \Planning\\ Our involvement began in the early stages of project development, providing budget preparation from FEL1 through FEL3 and permitting assistance\. This early engagement established a strong foundation for the project’s technical and financial execution\. \\ \Design \& Construction\\ The scope covered complex site development, substation layouts, and power distribution\. We engineered building and equipment foundations, process piping, and a fire protection system concept to support the line’s advanced heating and quenching technology\. \\ \Results\\ The project enabled the production of ultra\-high\-strength steels essential for modern automotive lightweighting and safety\. Our work highlights the capability to support a full project lifecycle for technologically advanced coating facilities\. - [US Steel Fairfield Works \- Melt Shop](https://cvengineering.com/portfolio/us-steel-fairfield-works-melt-shop/): CV Engineering provided construction engineering for a new Electric Arc Furnace \(EAF\) Steel Melt Shop at US Steel’s Fairfield Works in Alabama\. This brownfield project marked US Steel’s first\-ever EAF installation\. \\ \Planning\\ The project required the careful integration of new infrastructure within an established, historically significant industrial environment\. Our planning addressed unique logistical challenges to shift the facility toward modern electric steelmaking\. \\ \Design \& Construction\\ The technical scope included a 180\-ton AC electric arc furnace, a vacuum tank degasser, and a gas cleaning plant\. We delivered the structural design for the mill building, foundations, a 161/35kV substation, and a STATCOM for power quality management\. \\ \Results\\ Despite the complexities of the brownfield site, the project successfully established a modern, efficient steelmaking platform\. The execution demonstrated our ability to navigate the challenges of integrating new technology into existing operations safely and reliably\. ## Optional - [Sitemap index](https://cvengineering.com/sitemap_index.xml)