CV Engineering provided design and engineering services for the installation of a new Electric Arc Furnace (EAF) Steel Melt Shop on a brownfield site.
• US Steel’s First EAF Based Steel Making
• 180T AC EAF
• Vacuum Tank Degasser
• Cooling Treatment Plant
• 161/35kV Substation
• STATCOM
• Air Separation Plant
• Site Development
• Underground Utilities
• Power Distribution
• Mill Building Structural
• Architectural
• Building & Equipment Foundations
• Sheet Piling & Auger Piling
• Building Utilities & Electrics
• Process Equipment Platforms
• Process Piping & Electrics