Built on Experience. Proven in the Field.

From greenfield megaprojects to complex brownfield expansions, our work reflects disciplined execution across high-stakes steel, heavy metal, and industrial facilities.

Filter projects:

Big River Steel NGO Project

After successful construction installation and operation of all Phase 1 and Phase 2 equipment, Big River Steel (BRS) is expanding the Cold Rolling Facility by adding the Non-Grain Oriented (NGO) processing lines facility.

ArcelorMittal NGOES Project

ArcelorMittal (AM) is installing a new Non-Grain Oriented Electrical Steel (NOES) Facility in Calvert, Alabama, USA. The facility is estimated to have a production of 150,000 TPY Capacity

PRO-TEC Coating – Galvanizing Line #3

Construction engineering services for the Gen3 Continuous Galvanizing Line #3 expansion project.

US Steel Fairfield Works – Melt Shop

CV Engineering provided design and engineering services for the installation of a new Electric Arc Furnace (EAF) Steel Melt Shop on a brownfield site.

Big River Steel – Mini Mill #2

Lead engineering partner for a 3.6 MTPY flat rolling facility expansion adjacent to an existing mill.

SDI Columbus – Flat Rolling Facility

CV Engineering served as the prime engineering company for this 3.4 MTPY Flat Rolling Facility situated on a 1400-acre greenfield site.

Mississippi Silicon – Silicon Metals Plant

CV Engineering provided construction engineering services for the installation of a silicon metals manufacturing facility on a 100-acre greenfield site.

Nucor Steel Kankakee – MBQ Mill

Enabling 500,000 tons of annual production while expanding long steel offerings through seamless integration, reliable design, and high safety standards.

Nucor Steel Brandenburg – Plate Mill

CV Engineering is the Engineer of Record for the 1.6MTPY plate mill on a 1100-acre greenfield site.

Big River Steel – Mini Mill #1

The prime engineering partner for 3.2 MTPY flat rolling facility located on a 1,300-acre greenfield site producing high-quality steel products.