Big River Steel NGO Project

Osceola, AR
Non-Grain Oriented processing line Facility
Construction Engineering Services
Adding new lines to the existing facilities
2021–2023
After successful construction installation and operation of all Phase 1 and Phase 2 equipment, Big River Steel (BRS) is expanding the Cold Rolling Facility by adding the Non-Grain Oriented (NGO) processing lines facility.

Project Highlights:

• Reversing Cold Mill #1 (RCM)
• Coil Repair Line (CRL)
• Annealing and Coating Line #1 (ACL)
• Bare Coil Slitting Line & Packing Line
• Continuous Pickling Line Modifications
• 20-Coil Heating Stations at Entry End of CPL
• Coil Transfer Cars
• Water System for Air Compressor Building
• Current and 3 future Hydrogen Units (PHG-830)

Our Scope:

• Site Development
• Site Utilities & Infrastructure
• Building Foundation & structure
• Equipment Foundations
• Piling
• Structural Steel
• HVAC & Plumbing
• Building Utilities & Electrics
• Process Piping & Electrics